RATE SHEET |
| TRAVELIFT- HAUL, BLOCK, and LAUNCH |
| 70 ton lift..... |
17' max beam..... |
$7.00 |
per foot |
| 100 ton lift..... |
23' max beam.... |
$12.00 |
per foot |
| 300 ton lift.... |
30' max beam.... |
$25.00 |
per foot |
|
|
ENVIRONMENTAL CHARGE for working yard
| 0-60' 1st month.... |
$2.75 per foot |
|
0-60'.... |
$1.75/ft each additional month |
| 61' and up.... |
$3.75 per foot |
|
61' and up.... |
$2.25/ft each additional month |
|
|
LAYDAYS (Basic Rate)*
(multihulls x 1.5 per day)
| |
|
Mulithulls |
| 35' and under.... |
$45.00 per day |
($67.50) |
| 36' to 50'.... |
$1.80 per foot per day |
($2.70) |
| 51' to 69'.... |
$2.00 per foot per day |
($3.00) |
| 70' to 89'..... |
$2.80 per foot per day |
($4.20) |
| 90' and up..... |
$3.90 per foot per day |
($5.85) |
|
| * Laydays increase by 20% each 60 days to a maximum of 200% of the basic rate |
|
DOCKAGE **
(multihulls x 1.5 per day)
| |
|
Multihulls |
| 35' and under.... |
$40.00 per day |
($60.00) |
| 36' to 50'........ |
$1.00 per foot per day |
($1.50) |
| 51' to 69'........ |
$1.80 per foot per day |
($2.70) |
| 70' to 89'.... |
$2.50 per foot per day |
($3.75) |
| 90' and up.... |
$3.20 per foot per day |
($4.80) |
|
** $.12 per kilowatt/metered
|
|
SURVEY
| 70 ton lift.... |
$5.00 per foot for first hour |
| 100 ton lift.... |
$10.00 per foot for first hour |
| 300 ton lift.... |
$20.00 per foot for first hour |
|
|
EQUIPMENT RATES
| Travelift 70 ton.... |
$200.00 per hour |
|
Crane w\operator.... |
$200.00 per hour |
| Travelift 100 ton.... |
$300.00 per hour |
|
Forklift w\operator.... |
$50.00 per 1\2 hour |
| Travelift 300 ton.... |
$600.00 per hour |
|
Cooling Tower.... |
$350.00 per week |
|
| Covered Work Sheds.... |
$7.00 |
per foot per day |
| Pressure Wash....... |
$3.00 |
per foot |
| Mast Storage....... |
$300.00 |
per mast per month |
| LMC Container Rental....... |
$350.00 |
per month |
| Container Storage....... |
$250.00 |
per month |
| Dry Storage....... |
$35.00 |
per foot per month |
|
|
| NOTICE TO CUSTOMERS AND CONTRACTORS |
- It is the responsibility of the owner\agent to make sure all contractors have up-to-date insurance on file with our office
before work begins on the vessel.
- Spray painting and sandblasting are prohibited except by approved contractors of LMC.
- LMC does not provide ladders or scaffolding.
- A two-day minimum is required.
- Proof of insurance is required for all vessels in our marina/working yard.
|
|
RATES EFFECTIVE SEPTEMBER 1, 2007
NOTE: ALL RATES ARE SUBJECT TO CHANGE WITHOUT NOTICE
|